HVAC, Generator & Equipment Lifting

Precise rooftop unit placement, generator and transformer setting, and equipment installation — landed exactly where it needs to go.

Overview

HVAC / Generator / Equipment Placement

Mechanical and electrical equipment often has to land in a tight, elevated, or exact spot. Elevate lifts and sets rooftop HVAC units, generators, transformers, and other equipment with the control needed for a clean placement.

We plan reach and positioning around building height and access, and coordinate with your mechanical, electrical, or install crew.

Capabilities

Equipment Lifting We Provide

  • HVAC unit lifting & rooftop placement
  • Rooftop unit change-outs
  • Generator lifting & placement
  • Transformer lifting & placement
  • Electrical equipment setting
  • Equipment installation
  • Equipment removal
  • Condenser & chiller placement
  • Pad-mounted equipment setting
When To Call

When You May Need This Service

  • Setting or replacing a rooftop HVAC unit
  • Placing a standby generator on a pad or platform
  • Setting a transformer or electrical gear
  • Installing equipment above ground level
  • Removing and replacing failed equipment
  • Landing equipment in a tight or obstructed spot
Equipment & Access

Equipment & Access Considerations

For rooftop work, share building height, the set location relative to the roof edge, and where the crane can set up. Note parapets, obstructions, or landscaping that affect reach.

For generators and transformers, provide the unit weight and dimensions and confirm the pad or platform is ready before the lift.

Our Process

What To Expect

  1. 1

    Request

    Call or send the form with your load, site, and timing. We review your request before confirming arrangements.

  2. 2

    Project Review

    We review weight, dimensions, height, and access to confirm the right approach.

  3. 3

    Scheduling

    We coordinate a date and window that fits your site and other trades.

  4. 4

    Site Evaluation

    We assess ground conditions, set-up area, overhead hazards, and clearances.

  5. 5

    Lift Planning

    We plan rigging, positioning, and sequence with safety first.

  6. 6

    Execution & Closeout

    We complete the lift, confirm the result, and leave the site clear.

Along The Road

Equipment Placement Work

Lifting and rigging imagery. Illustrative images are labeled and do not document completed Elevate projects.

  • Crane at a residential tree-work site
Request A Lift

Project Intake Form

Your Contact Details
Job Site
Project Details
The Load & Site Conditions

If known

If known

If known

Attachments & Notes

Photos of the load, site, and access help us plan the lift. JPG, PNG, GIF, WEBP or PDF; up to 3 files, 2 MB each and 2.5 MB total.

If applicable

This form is monitored during business operations. For life-threatening emergencies call 911 first, then (601) 940-5499.

Answers

Frequently Asked Questions

Can you set a unit on a tall building?

Reach depends on both height and how far the set point is from the crane. Share building height, the set location, and the set-up area and we will confirm what is achievable.

Do you handle rooftop change-outs?

Yes — removing the old unit and setting the new one in the same visit is common when access allows.

Can you place a generator or transformer?

Yes. Provide the unit weight and dimensions and confirm the pad or platform is ready. Note that any electrical connection and utility coordination is handled by your electrical contractor and the utility.

How precisely can equipment be placed?

Very precisely — we use controlled picks and tag lines so equipment lands cleanly on curbs, pads, or mounts.