Equipment Installation & Removal
Crane and rigging support to install new equipment and remove old units — cleanly and in the right order.
Swapping equipment is a two-part lift: the old unit has to come out and the new one has to go in, often through the same tight opening and onto the same footprint.
Elevate sequences installation and removal so the change-out is efficient, and coordinates with the trades handling connections.
- Rooftop and mechanical units
- Production and shop equipment
- Generators, transformers, and tanks
- Compressors, pumps, and skids
- Structural and platform components
- Failed units needing emergency removal
- Replacing end-of-life equipment
- Installing new production capacity
- Removing units for repair or disposal
- Setting equipment onto a roof or platform
- Change-outs during a shutdown
- Emergency removal of a failed unit
Install-and-remove work needs weights and dimensions for both the old and new units, plus the access path and final locations. We plan the sequence so the site is not left exposed between picks.
- 1
Request
Call or send the form with your load, site, and timing. We respond fast.
- 2
Project Review
We review weight, dimensions, height, and access to confirm the right approach.
- 3
Scheduling
We coordinate a date and window that fits your site and other trades.
- 4
Site Evaluation
We assess ground conditions, set-up area, overhead hazards, and clearances.
- 5
Lift Planning
We plan rigging, positioning, and sequence with safety first.
- 6
Execution & Closeout
We complete the lift, confirm the result, and leave the site clear.
Can you remove the old unit and set the new one the same day?
Often, yes — sequencing both in one visit is efficient. Share both units' details and the access so we can plan the change-out.
Do you handle the connections?
No — we handle the lift and placement; your mechanical or electrical contractor makes the connections. We coordinate timing.